0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Manila Bay Bridge
Beginning of works: 2024
Completion: 2029
Status: project phase

Project Type

Location

Location: ,
,
Coordinates: 14° 22' 0" N    120° 37' 0" E
Show coordinates on a map

Technical Information

Dimensions

total length 32.15 km
number of lanes 2 x 2
main bridge (South Channel Bridge)
main span 900 m
total length 1 800 m
span lengths 450 m - 900 m - 450 m
vertical navigation clearance 72.3 m
horizontal navigation clearance 650 m
pylons height 305 m
secondary bridge (North Channel Bridge)
main span 400 m
vertical navigation clearance 40.5 m
horizontal navigation clearance 300 m
pylons height 181 m

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20088469
  • Published on:
    05/05/2024
  • Last updated on:
    05/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine